Buildertrend

A locked estimate and an approved change order stay inside Buildertrend. What the receptionist records during the job is written into Zenvox.

7 days, 20 answered calls, no card

Where your job site call lands

The call is written into Zenvox: who is calling, which job, what is being asked, what deadline was stated. Homeowner selections, budget allowances, the locked estimate and change orders stay inside Buildertrend, which keeps the truth of them. Zenvox reads the project and the customer to attach the call to the right job; it writes nothing into Buildertrend, and approval stays where it belongs.

Reading runs through Buildertrend's partner programme and the authorisation granted from your account. Payments, selections and approvals stay in the software's workflow, between you and your customer.

Buildertrend is project management software for residential building and renovation; a job lives on changes, and every change carries a price, a signature and a schedule consequence.

Read, create, update, cancel

The connection reads; the other three actions run in Zenvox and in Buildertrend, because a selection, an allowance or a change is approved inside Buildertrend, by you and your customer.

ActionWhat that means
ReadShe finds the project and the customer in Buildertrend from the name and the number, and attaches the call to the right job.
CreateA mid-project customer request is created inside Zenvox, attached to the job, and reaches you as recorded. Nothing is written into Buildertrend.
UpdateA selection, an allowance or a locked estimate does not move from a phone call. The lock exists precisely for that.
CancelA change order is approved or declined inside the software's workflow, with the customer's decision kept on file. The receptionist records the request; approval stays where it belongs.

What is included, what needs an add-on

During a build, the phone rings for three reasons: a current customer, a new project, a supplier. Your receptionist separates them, attaches the first to its file, qualifies the second and hands you the third. That is your base, with nothing plugged in.

Add-ons that work with your software

Assisted estimates

The next project's file built while you are on the current site, drawings or none, then follow-up until an answer lands.

Contracts and recurring service

Post-build follow-up, warranty and maintenance reminders: what brings a homeowner back two years later instead of sending them searching.

Authorisation, and where truth sits

Reading is authorised from your account. What follows says who holds what.

  • Your account stays yours; Zenvox asks for no credentials
  • The software holds the truth on estimates, allowances and approved changes
  • Zenvox holds the truth on the call: who rang, when, what was asked, and the recording
  • A change request noted by phone is a request, not an approval

Your Zenvox base keeps the same price, and connecting adds no fee to it.

A kitchen job underway. The homeowner calls on a Wednesday afternoon while the contractor is on another site.

CustomerI just saw my cabinets installed, and I would like different pulls on them.

ReceptionistI will take your name and a callback number, then attach this to your project. Do you have the exact model, or a photo you can text me?

ReceptionistI am recording this as a change request. It may affect the price and the schedule, so your contractor will come back to you with a change order to approve.

The contractor receives the request attached to the right project, photo included. He prepares the change order in his software and sends it over. Nothing was approved over the phone, which is exactly what protects both parties.

If no connection exists

Without a connection, the receptionist works in Zenvox and Buildertrend keeps doing its own job.

  • Every call is attached to the right project from the caller's name and number
  • Change requests are recorded, time-stamped and kept, which beats remembering a conversation
  • New projects are qualified while you are on a site
  • Every base capability works without this connection

Questions about this connection

Does a change request noted by phone count as an approval?

No, it is a request, not an approval. A change order is approved or declined inside the software's workflow, with the customer's decision kept on file, and that is exactly what protects both parties.

Does Zenvox change a locked estimate?

No. A selection, an allowance or a locked estimate does not move from a phone call: the lock exists precisely for that. Those objects stay inside Buildertrend, which keeps the truth of them.

Is there a connection to install?

One, for reading: it finds the project and the customer to attach the call to the right job. It is authorised from your account, and nothing is written into Buildertrend.

How are calls attached to the right job?

From the name and the number: every call is attached to the right project, and the request reaches you as recorded. Change requests are recorded, time-stamped and kept, which beats remembering a conversation.

Which one holds the truth, Zenvox or the software?

The software holds the truth on estimates, allowances and approved changes. Zenvox holds the truth on the call: who rang, when, what was asked, and the recording.

Where to next

See the trade concerned, or the full software list.

Buildertrend

A locked estimate and an approved change order stay inside Buildertrend. What the receptionist records during the job is written into Zenvox.

Start your free trial7 days, 20 answered calls, no card